So, in the last month..
Exterior: from wood to stucco, then a tinted layer of "cabbage patch green", which goes rather nicely with the cedar. Landscaping crew has built us levels, complete with stairs and a paving-stone sidewalk. The only thing missing is a set of front stairs...
We have a patio, complete with seating-height wall, a few levels for planting, and then an upper yard, which will have grass for the girls to play on. Another wall is yet to go up, along the back of the property, to contain the much awaited vegetable garden. Plans are in the works, say the dads, to connect our back yard with buddy Natalie's (4 doors down) so the girls don't have to traipse along the "big road." We shall see...
laying 4000 sq ft of tile is, apparently, a bigger job than lifting 4000 sq ft of tile was, It's been underway for more than a week, but we're still on the main floor. It looks super, though. Both kitchen floors are done, so that...
Anticipating fences, more tiling, cabinet installation, etc in the near future.